PrepTest 81, Section 2, Question 19

Difficulty: 
Passage
Game

Analyst: Any new natural-gas-powered electrical generation station needs to be located close to a natural-gas pipeline, a large body of water for cooling, and transmission lines. It also must be situated in a region where residents will not oppose construction. Our country has an extensive system of transmission lines, but our natural-gas pipelines run in the vicinity of only three of our large bodies of water, and residents would oppose any significant construction projects near these bodies of water.

Analyst: Any new natural-gas-powered electrical generation station needs to be located close to a natural-gas pipeline, a large body of water for cooling, and transmission lines. It also must be situated in a region where residents will not oppose construction. Our country has an extensive system of transmission lines, but our natural-gas pipelines run in the vicinity of only three of our large bodies of water, and residents would oppose any significant construction projects near these bodies of water.

Analyst: Any new natural-gas-powered electrical generation station needs to be located close to a natural-gas pipeline, a large body of water for cooling, and transmission lines. It also must be situated in a region where residents will not oppose construction. Our country has an extensive system of transmission lines, but our natural-gas pipelines run in the vicinity of only three of our large bodies of water, and residents would oppose any significant construction projects near these bodies of water.

Analyst: Any new natural-gas-powered electrical generation station needs to be located close to a natural-gas pipeline, a large body of water for cooling, and transmission lines. It also must be situated in a region where residents will not oppose construction. Our country has an extensive system of transmission lines, but our natural-gas pipelines run in the vicinity of only three of our large bodies of water, and residents would oppose any significant construction projects near these bodies of water.

Question
19

The analyst's statements, if true, most strongly support which one of the following statements about the analyst's country?

Future electrical needs will have to be met by alternatives to natural-gas-powered generation.

If a new natural-gas-powered electrical station is built in a region, many residents will move away from that region.

No site would be suitable for constructing a natural-gas-powered electrical station unless the existing system of natural-gas pipelines is expanded.

There currently is no natural-gas-powered electrical generation station near any of the three largest bodies of water.

Many residents who would oppose the construction of a new natural-gas-powered electrical station in their region would not oppose the construction of new transmission lines there.

C
Raise Hand   ✋

Explanations

Explanation coming soon! Want one now? Hit the Raise Hand button.

0 Comments

Active Here: 0
Be the first to leave a comment.
Loading
Someone is typing...
No Name
Set
4 years ago
Admin
(Edited)
This is the actual comment. It can be long or short. And must contain only text information.
No Name
Set
2 years ago
Admin
(Edited)
This is the actual comment. It's can be long or short. And must contain only text information.
Load More
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Load More
Leave a comment
Join the conversation
You need the Classroom Plan to comment.
Upgrade