PrepTest 81, Section 1, Question 16
The operators of an outdoor amusement center are designing an obstacle course that will consist of a sequence of six separate obstacles: a rope bridge, a spinning platform, a tunnel, a vaulting apparatus, a wall, and a zipline. The obstacles will be placed in order from start to finish (first to sixth), in accordance with the following constraints:
The operators of an outdoor amusement center are designing an obstacle course that will consist of a sequence of six separate obstacles: a rope bridge, a spinning platform, a tunnel, a vaulting apparatus, a wall, and a zipline. The obstacles will be placed in order from start to finish (first to sixth), in accordance with the following constraints:
The operators of an outdoor amusement center are designing an obstacle course that will consist of a sequence of six separate obstacles: a rope bridge, a spinning platform, a tunnel, a vaulting apparatus, a wall, and a zipline. The obstacles will be placed in order from start to finish (first to sixth), in accordance with the following constraints:
The operators of an outdoor amusement center are designing an obstacle course that will consist of a sequence of six separate obstacles: a rope bridge, a spinning platform, a tunnel, a vaulting apparatus, a wall, and a zipline. The obstacles will be placed in order from start to finish (first to sixth), in accordance with the following constraints:
The spinning platform must be the third or fourth obstacle.
The wall must be placed just before the zipline.
The rope bridge cannot be placed just before or just after the vaulting apparatus.
If the rope bridge and the vaulting apparatus are both earlier in the sequence than the tunnel, which one of the following must be true?
The spinning platform is the fourth obstacle.
The tunnel is the fifth obstacle.
The vaulting apparatus is the fifth obstacle.
The wall is the first obstacle.
The zipline is the third obstacle.
0 Comments