PrepTest 54, Section 1, Question 19

Difficulty: 
Passage
Game
4

A panel reviews six contract bids�H, J, K, R, S, and T. No two bids have the same cost. Exactly one of the bids is accepted. The following conditions must hold:

A panel reviews six contract bids�H, J, K, R, S, and T. No two bids have the same cost. Exactly one of the bids is accepted. The following conditions must hold:

A panel reviews six contract bids�H, J, K, R, S, and T. No two bids have the same cost. Exactly one of the bids is accepted. The following conditions must hold:

A panel reviews six contract bids�H, J, K, R, S, and T. No two bids have the same cost. Exactly one of the bids is accepted. The following conditions must hold:

The accepted bid is either K or R and is either the second or the third lowest in cost.

H is lower in cost than each of J and K.

If J is the fourth lowest in cost, then J is lower in cost than each of S and T.

If J is not the fourth lowest in cost, then J is higher in cost than each of S and T.

Either R or S is the fifth lowest in cost.

Question
19

Which one of the following bids CANNOT be the fourth lowest in cost?

H

J

K

R

T

A
Raise Hand   ✋

Explanations

9 Worlds, Full Solve
A
B
C
D
E

0 Comments

Active Here: 0
Be the first to leave a comment.
Loading
Someone is typing...
No Name
Set
4 years ago
Admin
(Edited)
This is the actual comment. It can be long or short. And must contain only text information.
No Name
Set
2 years ago
Admin
(Edited)
This is the actual comment. It's can be long or short. And must contain only text information.
Load More
Thank you! Your submission has been received!
Oops! Something went wrong while submitting the form.
Load More
Leave a comment
Join the conversation
You need the Classroom Plan to comment.
Upgrade